Washington Township Master Bathroom Remodel – Completed May 2019

Before

The Washington Township homeowner came to us in need of an update in her master bathroom. It was functional, but was starting to fall apart and had a dated style.

We met with her to discuss her project and what could be done within the space to bring some life to it.

Design

We went to the house and did a full measure of the master bathroom. We then met with the homeowner for some design meetings where we came up with a game plan how the bathroom would be put together. Throughout the design meetings we created specifications and plans for the construction of the bathroom.

Construction

For this project, we kept the existing flooring and vanity as it was. Our main focus was on the bathtub and shower areas. We demolished those areas, but left the frame for the tub deck so we could re-tile it.

We framed for a niche in the shower, roughed in the plumbing, vented the fan, and patched the drywall where needed.

Next, it was time to install the new tile! We had worked with the homeowner during our design phase to come up with a large format tile for the tub and shower. We then installed a smaller tiles on the floor of the shower.

After tile was finished, we installed the new bathtub, finalized the plumbing, and painted the bathroom. We then sent in a cleaning crew to make sure that the bathroom spotless. Everything turned out perfect! The bathroom now has a clean, modern look and functions as it should. The homeonwer is thrilled with her new bathroom!

If you have a project of your own in mind, we’d be happy to discuss it with you!

Rochester Hills Bathroom Remodel – Completed December of 2019

Before

The homeowners came to us because their bathroom was in need of a renovation. We met with them to discuss their vision for the bathroom and how we could help them bring that vision to life.

Design

We came to their house to take measurements as the start of our design process. We then met with the clients for a series of design meetings. During this design phase, we worked with the clients to come up with detailed plans and specifications for the construction of the project.

Constrcution

After the design phase was completed and all plans and specifications were approved, we ordered all the materials and came up with a schedule for the construction of the bathroom.

We tore out the shower, flooring, toilet, vanity, and the hardware.

We then framed in the shower bench and the area for the niche. After that, we roughed in the plumbing for the new shower and toilet and then patched any holes in the drywall.

We installed moisture resistant board on the walls of the shower and waterproofing membrane on the floor so that the shower could be properly waterproofed before the tile was installed.

Next, we installed the tile, vanity, and countertop. Final plumbing, installation of base molding, and the touchups were completed after that.

We painted, installed hardware, installed the shower door, and sent in a cleaning crew to make sure that everything looked perfect for when we presented the final bathroom to the homeowners. Everything turned out great! The clients are very happy with their new bathroom!

If you have ideas for a project of your own, we’d be happy to meet with you to discuss how we can help bring your dream project to life! Click here to connect with us.