Rochester Hills Bathroom Remodel – Completed December of 2019

Before

The homeowners came to us because their bathroom was in need of a renovation. We met with them to discuss their vision for the bathroom and how we could help them bring that vision to life.

Design

We came to their house to take measurements as the start of our design process. We then met with the clients for a series of design meetings. During this design phase, we worked with the clients to come up with detailed plans and specifications for the construction of the project.

Constrcution

After the design phase was completed and all plans and specifications were approved, we ordered all the materials and came up with a schedule for the construction of the bathroom.

We tore out the shower, flooring, toilet, vanity, and the hardware.

We then framed in the shower bench and the area for the niche. After that, we roughed in the plumbing for the new shower and toilet and then patched any holes in the drywall.

We installed moisture resistant board on the walls of the shower and waterproofing membrane on the floor so that the shower could be properly waterproofed before the tile was installed.

Next, we installed the tile, vanity, and countertop. Final plumbing, installation of base molding, and the touchups were completed after that.

We painted, installed hardware, installed the shower door, and sent in a cleaning crew to make sure that everything looked perfect for when we presented the final bathroom to the homeowners. Everything turned out great! The clients are very happy with their new bathroom!