Washington Township Master Bathroom Remodel – Completed May 2019

Before

The Washington Township homeowner came to us in need of an update in her master bathroom. It was functional, but was starting to fall apart and had a dated style.

We met with her to discuss her project and what could be done within the space to bring some life to it.

Design

We went to the house and did a full measure of the master bathroom. We then met with the homeowner for some design meetings where we came up with a game plan how the bathroom would be put together. Throughout the design meetings we created specifications and plans for the construction of the bathroom.

Construction

For this project, we kept the existing flooring and vanity as it was. Our main focus was on the bathtub and shower areas. We demolished those areas, but left the frame for the tub deck so we could re-tile it.

We framed for a niche in the shower, roughed in the plumbing, vented the fan, and patched the drywall where needed.

Next, it was time to install the new tile! We had worked with the homeowner during our design phase to come up with a large format tile for the tub and shower. We then installed a smaller tiles on the floor of the shower.

After tile was finished, we installed the new bathtub, finalized the plumbing, and painted the bathroom. We then sent in a cleaning crew to make sure that the bathroom spotless. Everything turned out perfect! The bathroom now has a clean, modern look and functions as it should. The homeonwer is thrilled with her new bathroom!

If you have a project of your own in mind, we’d be happy to discuss it with you!