Shelby Township Double Bathroom Remodel – Part 2

Part 2: Her Bathroom

Before

The homeowners wanted to remodel two bathrooms in their home at the same time. One for their son and one for their daughter. They wanted a complete renovation of each bathroom.

We went through our design phase where we came up with a game plan for the construction of the bathrooms. This included crafting the layouts, selecting all materials, picking colors, and making detailed plans.

Construction

We demoed the daughter’s bathroom at the same time that we did the son’s bathroom. We did rough plumbing, electrical, and venting just after that. A new vanity was installed in the same location where were the old one had been removed.

We put in a new quartz countertop with an undermount sink. New tile was installed in the tub area and on the floor of the bathroom. We also installed a new mirror and decorative light fixtures.

After

Everything turned out so good! Gone are the small dated tiles, the pink tub, and the pink countertop. The bathroom now functions much better for their needs and looks so nice! They homeowners are very pleased with their daughter’s new bathroom.

If you have a project of your own that you’d like to discuss with us, you can reach out to us here. We’d be happy to discuss your remodeling project with you!

Shelby Township Double Bathroom Remodel – Part 1

Part 1: His Bathroom

Before

The homeowners came to us because they were looking to update two bathrooms in their home at the same time. One for their son and one for their daughter. They wanted a complete remodel of each bathroom. As part of the remodel, they also wanted to vent the bathrooms to reduce the risk of mold forming from excess moisture.

We went through our standard design phase where we came up with a game plan for the construction of the bathrooms. This included planning the layouts, making material selections, picking colors, and making detailed drawings and specifications.

Construction

We demoed the whole bathroom and framed for the half wall of the shower and the niche. We then got all the new plumbing hooked up and the electrical roughed in. The bathroom was also vented at this point in the project.

The shower area then got waterproofed and prepped for tile installation.

We installed a new vanity and quartz countertop to replace the ones that we had torn out. New wood-looking tile flooring was also installed, which looks so much better than the old school small, square tiles that the bathroom previously had.

After

After we completed the construction of the bathroom and passed all city inspections, we presented the homeowners with their son’s new bathroom. They’re very happy with how everything turned out! Their son’s bathroom now has a clean, modern look to it.

Part 2 of this double bathroom remodel is coming soon!

Rochester Hills Bathroom Remodel – Completed December of 2019

Before

The homeowners came to us because their bathroom was in need of a renovation. We met with them to discuss their vision for the bathroom and how we could help them bring that vision to life.

Design

We came to their house to take measurements as the start of our design process. We then met with the clients for a series of design meetings. During this design phase, we worked with the clients to come up with detailed plans and specifications for the construction of the project.

Constrcution

After the design phase was completed and all plans and specifications were approved, we ordered all the materials and came up with a schedule for the construction of the bathroom.

We tore out the shower, flooring, toilet, vanity, and the hardware.

We then framed in the shower bench and the area for the niche. After that, we roughed in the plumbing for the new shower and toilet and then patched any holes in the drywall.

We installed moisture resistant board on the walls of the shower and waterproofing membrane on the floor so that the shower could be properly waterproofed before the tile was installed.

Next, we installed the tile, vanity, and countertop. Final plumbing, installation of base molding, and the touchups were completed after that.

We painted, installed hardware, installed the shower door, and sent in a cleaning crew to make sure that everything looked perfect for when we presented the final bathroom to the homeowners. Everything turned out great! The clients are very happy with their new bathroom!

If you have ideas for a project of your own, we’d be happy to meet with you to discuss how we can help bring your dream project to life! Click here to connect with us.