Beautiful Bathroom Remodel in Washington Township

bathroom remodel in washington township

We recently had the fortune of working with some wonderful clients to do a bathroom remodel in Washington Township. They had a master bathroom that was in desperate need of a remodel. The vast majority of the bathroom had already been demoed when we first spoke with them. They sat down with us to discuss their project and how we could help them with it. It was at this point that they chose to move forward with us and start our design process.

With the help of our on-staff designer, our clients came to decisions on the layout of the bathroom as well as the materials that would be used.

The next step was the construction of their bathroom using the plans that we made during our design phase. As with all of our projects, we took photos of the bathroom before, during, and after the remodel. Below is a video that shows those before, during, and after photos of this bathroom remodel.

We hope that you enjoy this before, during, and after photo video of our bathroom remodel in Washington Township. Please feel free to reach out to discuss your home remodeling project.

Follow us on Instagram & Facebook

Our Awards

It’s always an honor when our company receives awards for the work that we do. The awards mean a lot to us because we put a lot of hard work into trying to give our clients the best experience that we can.

We’ve received many awards throughout the years and would like to share some of our favorites below.

Best of Houzz

Every year Houzz.com gives its professional remodelers and builders the ability to win Best of Houzz Awards for design and for customer service. According to Houzz, only 3-4% of their professionals on any given year will win a best of Houzz Award. The Design awards are given out based on the popularity of the project photos that are uploaded to a pro’s account, while the Service awards are earned based on the quality of client reviews from the previous year. Over the years, we have received many best of Houzz awards for both design and service.

Best of Houzz Design:
2015, 2018, 2019, 2020, & 2021

Best of Houzz Service:
2014, 2015, 2016, 2017, 2018, 2019, 2020, & 2021

We’re very proud of the Best of Houzz Awards that we’ve built up over the years. It’s a good metric for us to gauge how happy our clients are and whether people who use Houzz are into the kitchen, bathroom, and basement remodels that we’ve done.

HBA Remodeler of the Year

In 2018, the Home Builder’s Association of Southeast Michigan awarded us with their Remodeler of the Year award. We were thrilled that they chose us for the award and proudly display it in our showroom.

Big 50 Award 2016

In 2016, we were featured in Remodeling Magazine’s Big 50 issue where they showcase their top 50 remodelers in the country. This was a huge honor for us and we’re thankful that we were able to be featured alongside the other 49 wonderful remodelers.

Shelby Township Double Bathroom Remodel – Part 1

Part 1: His Bathroom

Before

The homeowners came to us because they were looking to update two bathrooms in their home at the same time. One for their son and one for their daughter. They wanted a complete remodel of each bathroom. As part of the remodel, they also wanted to vent the bathrooms to reduce the risk of mold forming from excess moisture.

We went through our standard design phase where we came up with a game plan for the construction of the bathrooms. This included planning the layouts, making material selections, picking colors, and making detailed drawings and specifications.

Construction

We demoed the whole bathroom and framed for the half wall of the shower and the niche. We then got all the new plumbing hooked up and the electrical roughed in. The bathroom was also vented at this point in the project.

The shower area then got waterproofed and prepped for tile installation.

We installed a new vanity and quartz countertop to replace the ones that we had torn out. New wood-looking tile flooring was also installed, which looks so much better than the old school small, square tiles that the bathroom previously had.

After

After we completed the construction of the bathroom and passed all city inspections, we presented the homeowners with their son’s new bathroom. They’re very happy with how everything turned out! Their son’s bathroom now has a clean, modern look to it.

Part 2 of this double bathroom remodel is coming soon!

Shelby Township Half Bath & Laundry Room Remodel

Before

One of our past clients came to us and asked if we could remodel her half bathroom and laundry room. We, of course, said yes and started working with her to design these rooms. Our designer created plans and specs for the construction of the project, just like she does for all of our other renovation projects.

One thing that the homeowner wanted as part of her half bath remodel was a unique accent wall. Our designer created a cool design for the wall and showed it to the homeowner. She loved it!

Construction

After the design was completed, we demolished existing rooms down to the drywall and started constructing according to the plans from our design process.

We gave the homeowner access to our online calendar so that she knew who to expect at her house every day and what they would be doing. Throughout the construction phase of the project we also kept detailed notes internally so that everyone within our company would know what was going on at the job on a daily basis.

After

After the construction was completed, we presented the homeowner with her freshly remodeled half bathroom and laundry room. She was very happy with how they turned out and commented multiple times about how much she loves the accent wall in her half bath. She said that our designer just “gets” her style.

We hope that you enjoy these after photos.

Visit our Houzz page to see more of our past projects as well as reviews from our past clients. If you have a project of your own that you’re interested in, please let us know about it. We would be happy to discuss it with you!

Washington Township Master Bathroom Remodel – Completed March 2019

Before

It was clear from the beginning that this Washington Township master bathroom was in need of some work. Wet met with the homeowners who were eager to have us update their dated bathroom.

Design

Our designer met with the homeowners to nail down the design details of the bathroom. She showed them samples and ideas for a functional and modern design for their bathroom. By the end of the design meetings, we had plans and specifications for the construction phase of the project.

Construction

We demolished everything in the bathroom down to the studs in some areas. We then framed the area for the new materials that would be installed. Our plumbers, electricians, and HVAC crews came in to rough in their respective areas.

We drywalled, mudded, and sanded the areas of the walls and ceiling where we had removed it.

We installed the cabinets, which really started to make the bathroom feel like it was coming together.

After the cabinets were installed, we put the countertop on the vanity, cement board on the floor, and waterproofed the shower to get it ready for tile.

We then tiled the shower and the bathroom floor. At this point the bathroom was close to being finished.

We installed the toilet, mirror, tub, and shower door. We then painted and did any minor touch ups that needed to be done. After all that, we presented the homeowners with their new bathroom! As you an see, there is a night and day difference between what the bathroom was and what it is now. The homeowners are thrilled with both the look and functionality of their new bathroom!

If you have a bathroom project of your own in mind, don’t hesitate to contact us to discuss your ideas. We would be happy to help!